About project

TRUST PROJECT was chosen by Technopolis Moscow to carry out the renovation of the road bridge, the most important infrastructure element of Technopolis Moscow. The renovation was completed within a record short period of time despite the complexity of the renovation as well as additional technical issues that had been discovered after the start of the project.
alt
alt
Scroll down alt

Unique solutions

Very expensive pieces of working equipment were located under the road bridge and could not be moved or turned off. The equipment belonged to “Crocus Nanoelectronics”, one of the residents of Technopolis Moscow, and was used for their non-stop 24/7 production process. In order to prevent accidental damage of the equipment and make sure that the aforementioned resident of Technopolis Moscow does not experience unwanted interruptions of their production, TRUST PROJECT designed and constructed sarcophagi that protected the expensive equipment during the renovation process.

Thanks to the ability of the team to find and implement unique and effective solutions TRUST PROJECT can always find solutions to the problems that cannot be foreseen and that always arise in projects of high complexity.

alt
alt

Additional challenges

There were some important cables under the road bridge. The cables supplied the electricity to the factory of “RENO RUSSIA” corporation that was located in close proximity to Technopolis Moscow. It was essential that the cabled be moved in such a way that the production schedule of the factory not be affected. Usually it would take two weeks to move the cables, however the factory could not stop its production for such a long period of time. The TRUST PROJECT team found a way to move the cables within 24 hours, which allowed the factory to resume its production process with minimum delays.

Record tight schedule

In accordance with the contact, the renovation was to be completed within a 9 month time period. Thanks to careful planning of resources at all stages of the project, it took TRUST PROJECT three months to complete the renovation. The management and the team of TRUST PROJECT made sure that the quality of the renovation was not affected.  It is years of experience that allow the management of TRUST PROJECT to efficiently manage its resources and work within record tight schedule for high complexity projects.

Unforeseen circumstances

Any business process or activity, especially in the area of construction, is fraught with unforeseen problems, changing circumstances, and other risks due to high complexity of the projects and technologies involved. It is the ability to quickly react to the arising problems and dynamically changing circumstances, the ability to assess their scope and possible solutions, as well as manage limited resources that determine the positive outcome of the project. The team of TRUST PROJECT has shown time and again that it possesses the aforementioned competencies and that the team can be trusted with the most challenging assignments.

Project results

The renovation of the road bridge was of utmost importance for Technopolis Moscow since it was the only road to the second floor of the main building. The road bridge is used for half of all logistics of Technopolis. The renovation allowed Technopolis to streamline and raise the capacity of its logistics. The road bridge was used for the transportation of raw materials and equipment into the main building as well as the outgoing logistics of the final products of the residents of Technopolis.

TRUST PROJECT made sure the production schedules of none of its residents were affected by the renovation activities of this main artery of the cluster.